Clearance of cast iron gutters followed by priming & sealing the joints
We would like to welcome our new work horse to the team after the demise of our old one
Installation of GRP top coat containing U.V. reflective protection.
Installation of new Sterling OSB board, GRP drip edge trims & new GRP deck.
Preparing the deck by removing the old failed green mineral to get a more even surface
Roof overhaul. Repairs to under felt using breathable membrane underlay, lifting & re-bedding ridge & hip tiles. Replacing broken/damaged roof tiles. Installation of new UPVC cladding, fascia & trims to cheek & face of dormer. Sealing failed bitumen flat dormer roof deck using GRP. Chimney stack rendering.
When this roof was installed the under felt at the back of the dormer was installed behind the top lead flashings at the cheeks causing water ingress. It was also installed over the bottom lath batten creating a natural pooling area for the rain water, the white tide marks can clearly be seen in the photos. Consequently the under felt has aged quickly & failed
Lifting & re-bedding the ridge tiles, re-pointing the lead valleys & fascia/soffit painted
Installation of new rubber EPDM cap sheet, fibre glass flashings, gutter, downpipe, trims & repairs to rotten window frame
Here at Assured Pro Roofing we are very pleased to announce that we are sponsoring Crosland Heath Golf Club PGA Scratch team for the current season
We have been lucky enough to have a scaffold erected at a forth coming job on the route of Le Tour De France 2014