Strip & re-cover of concrete tiled roof using new vapour permeable breathable membrane pitched roof underlay and tanalised lath battens. This roof was at the very end of it’s life as the old under felt had completely disintegrated
Strip & re-cover of concrete tiled roof using new vapour permeable breathable membrane pitched roof underlay and tanalised lath battens. This roof was at the very end of it’s life as the old under felt had completely disintegrated
Strip and re-cover of concrete tiled roof using new vapour permeable breathable membrane pitched roof underlay and tanalised lath battens. All tiles and dry verge covers re-fixed with any that were damaged or broken replaced with new. Installation of new half round concrete ridge tiles mechanically secured using dry ridge fixing system.
Slate repairs & gulley clearance
Lifting, re-bedding & pointing the hip & ridge tiles
Installation of new flashings, repairs to skylights, Ubiflex apron chase & cast iron gulley plus gutter clearance
Installation of EPDM rubber cap sheets & gutter / gulley clearance
Installation of new Classic Bond EPDM rubber membrane
Repairs to flat roof & upstands plus gutter & gulley clearance
Repairs to stone tiled roof & rain water goods plus gutter & gulley clearance
New EPDM rubber membrane, stripping out the slates & rotten lath battens plus gutter, gulley & flat roof clearance
Installation of new EPDM rubber membrane on sawdust hopper & gutter, gulley & flat roof clearance
Repairs to the asphalt flat roof & upstands plus gutter & gulley clearance
Gutter & gulley clearance
Re-pointing the ridge tile & chimney stack flaunch plus rendering the chimney stack
Preparing & sealing the cast iron gutter joints in situ
New EPDM rubber membrane
Removing the redundant chimney stack which has been causing severe damp inside the property
Raking out and re-pointing the failed mortar on the ridge tiles and chimney stack flaunch using new mortar plus installation of new black UPVC square line guttering, brackets, unions and outlet
Outlet, gulley & flat roof clearance followed by repairs to the gulley & upstand. When this GRP (Glassfibre Reinforced Polyester) gulley was installed no glassfibre chopped strand netting was used to reinforce the polyester where the gulley meets the upstands at the parapet wall. Consequently without this reinforcement the polyester has failed and along with a blocked outlet has caused extreme water ingress into the property