Lifting & re-bedding the hip & ridge tiles using new mortar, installation of eaves felt support trays & repairs to the perished bitumen under felt using breathable membrane pitched roof underlay.
Lifting & re-bedding the hip & ridge tiles using new mortar, installation of eaves felt support trays & repairs to the perished bitumen under felt using breathable membrane pitched roof underlay.
Clearing out the gutter, sealing the joints, slate repairs & re-pointing the failed mortar.
Re-dressing the lead flashings & pointing the lead chase.
Installation of new breathable membrane pitched roof underlay at the abutment.
Lifting the water table coping stones on the verge to carry out repairs to the perished bitumen under felt.
Re-pointing the failed mortar below the window cill.
Installation of newly refurbished cast iron guttering & re-pointing of failed mortar around the dentils.
Dismantling downpipe to check for blockages with a water test.
Preparing, priming & sealing the lap on the steel clad sheets & gutter clearance.
Sealing the bonds between the parapet wall coping stones using polyurethane, Installation of new flashings at the parapet wall & capping off redundant chimney stack with a new flaunch.
Replacement of missing Rosemary tiles, re-pointing the ridge tiles & lead valley plus sealing the lead gulley.
Re-pointing the failed mortar on the water table coping stones at the verges.
Re-pointing the water table coping stones at the verge.
Raking out & re-pointing failed mortar which has been causing rising damp and mould inside the property.