Gutter clearance
Re-pointing the ridge tile & chimney stack flaunch plus rendering the chimney stack
Preparing & sealing the cast iron gutter joints in situ
New EPDM rubber membrane
Removing the redundant chimney stack which has been causing severe damp inside the property
Raking out and re-pointing the failed mortar on the ridge tiles and chimney stack flaunch using new mortar plus installation of new black UPVC square line guttering, brackets, unions and outlet
Outlet, gulley & flat roof clearance followed by repairs to the gulley & upstand. When this GRP (Glassfibre Reinforced Polyester) gulley was installed no glassfibre chopped strand netting was used to reinforce the polyester where the gulley meets the upstands at the parapet wall. Consequently without this reinforcement the polyester has failed and along with a blocked outlet has caused extreme water ingress into the property
Stripping off the concrete roof tiles, lead flashings, lath battens, valley boards, perished bitumen under felt & dry verge covers to install new vapour permeable breathable membrane pitched roof underlay & GRP (Glassfibre Reinforced Polyester) valley boards plus lifting, re-bedding & pointing the ridge tiles
Stripping off the lead flashings, concrete roof tiles & lath battens to carry out repairs to the perished bitumen under felt using vapour permeable breathable membrane pitched roof underlay & eaves felt support trays