Preparing and rendering the chimney stack plus sealing the lap on the flat roof green mineral cap sheet.
Preparing and rendering the chimney stack plus sealing the lap on the flat roof green mineral cap sheet.
New hopper heads & downpipes to re-direct the excess rain water run off & sealing the flashings at the abutment wall.
Re-bedding & pointing the ridge tiles which had been lifted to take the new breathable membrane over the apex of the roof.
Stripping off the concrete tiles, ridge tiles & lath battens to carry out repairs to the collapsing perished bitumen under felt using breathable membrane pitched roof underlay. This was installed under the bonding gutter over the party wall which has damp & mould all the way up it inside the property.
Capping off & flaunching the chimney stack, re-pointing the failed mortar on the stack & sealing the stench pipe/lead flashings/green mineral.
Rendering the remainder of the lowered chimney stack & sealing the gap between the back of the cast iron gutter and the tiles which has been causing damp inside the property.
Installation of new chimney stack flaunch & cowls.
Lowering the redundant chimney stack which has been causing damp inside the property.
Re-bedding & pointing the ridge tiles and re-pointing the failed mortar on the gable end wall/lead chase.
Stripping off the concrete tiles & rotten lath battens to install new breathable membrane pitched roof underlay all the way up the verge from the gutter line to the ridge line & over the apex followed by installation of new tanalised lath battens, drip trays & re-bedding/pointing the tiles at the verge.
Installation of new lead apron at the abutment & sealing the chase.
Stripping off the concrete tiles & lath battens followed by installation of breathable membrane pitched roof underlay at the abutment. When the original roof was installed the under felt was left too short at the top of the roof where it meets the wall at the abutment.