Stripping off the concrete roof tiles, redundant flue/cowl, lath battens and monofoil under felt to install eaves felt support trays, tanalised lath battens and vapour permeable breathable membrane pitched roof underlay
Stripping off the concrete roof tiles, redundant flue/cowl, lath battens and monofoil under felt to install eaves felt support trays, tanalised lath battens and vapour permeable breathable membrane pitched roof underlay
Installation of new GRP (Glassfibre Reinforced Polyester) flashings at the parapet wall upstand
Re-bedding and pointing the ridge tiles using new mortar
Re-fixing the slates replacing any that were damaged or broken
Stripping off the slates and lath battens to install new vapour permeable breathable membrane pitched roof underlay
Re-fixing the slates replacing any that were damaged or broken
Stripping off the old slates and lath battens to install new eaves felt support trays, vapour permeable breathable membrane pitched roof underlay, tanalised lath battens, new slates and hip tiles
Installation of new internal rain water goods to return the gutter flow
Applying red oxide primer to the rusty cast iron gutter
Clearing out the trough gutters