Lining the gulley with EPDM rubber and re-fixing the slates plus new code 4 milled lead on the valley gutter
Stripping off the slates, lath battens and lead to install new Proctor’s Roofshield vapour permeable breathable membrane pitched roof underlay and tanalised lath battens
Re-constructing the top of the gable end wall
Removing the dilapidated redundant chimney stack