Stripping off the bottom courses of concrete roof tiles to carry out repairs to the perished bitumen under felt using eaves guard trays, vapour permeable breathable membrane pitched roof underlay and tanalised lath battens
Stripping off the bottom courses of concrete roof tiles to carry out repairs to the perished bitumen under felt using eaves guard trays, vapour permeable breathable membrane pitched roof underlay and tanalised lath battens
Installation of new black UPVC round downpipe
Re-pointing the failed mortar at the verges
Stripping off the concrete roof tiles, mortar and lath battens to carry out repairs to the perished bitumen under felt along the verges and install new black UPVC interlocking dry verge covers system
Stripping off the slates, lath battens and perished under felt to install new vapour permeable breathable membrane pitched roof underlay and tanalised lath battens plus gutter clearance
Raking out and re-pointing the failed mortar on the hip tiles, ridge tiles and chimney stack
Strip and re-cover of pitched roof using new eaves guard trays, Proctor’s Roofshield vapour permeable breathable membrane pitched roof underlay, tanalised lath battens, GRP (Glassfibre Reinforced Polyester) dry fix bonding gutters over the party walls, Breedon concrete roof tiles, UPVC interlocking dry verge covers system and angled concrete ridge tiles mechanically secured using dry fix ridge system plus new black ash UPVC fascias and soffits with new black UPVC round rainwater goods
Carrying out repairs to the wrongly installed bitumen under at the cheek of the dormer using vapour permeable breathable membrane pitched roof underlay plus flat roof repairs