Raking out and re-pointing the failed mortar torching at the top of the gable ends on the underside of the water table coping stones on the verges
Raking out and re-pointing the failed mortar torching at the top of the gable ends on the underside of the water table coping stones on the verges
Strip and re-cover of pitched roof using new eaves guard trays, Proctors Roofshield vapour permeable breathable membrane pitched roof underlay, tanalised lath battens, interlocking Double Roman concrete roof tiles, code 4 milled lead flashings, half round concrete ridge tiles mechanically secured using dry fix ridge system and UPVC interlocking dry verge covers system plus new EPDM rubber membrane cap sheet on the flat dormer roof and chartwell green shiplap cladding on the cheeks and face of the dormer