Re-dressing the lead flashings & pointing the lead chase.

 

20160225_115445 20160225_115450 20160225_115459 20160225_115508 20160225_115813

 

Installation of new breathable membrane pitched roof underlay at the abutment.

 

20160223_10030420160223_100308 20160223_100319

 

Lifting the water table coping stones on the verge to carry out repairs to the perished bitumen under felt.

 