Re-bedding & pointing the ridge tiles and re-pointing the failed mortar on the gable end wall/lead chase.
Stripping off the concrete tiles & rotten lath battens to install new breathable membrane pitched roof underlay all the way up the verge from the gutter line to the ridge line & over the apex followed by installation of new tanalised lath battens, drip trays & re-bedding/pointing the tiles at the verge.
Leave a Reply