Re-bedding & pointing the ridge tiles and re-pointing the failed mortar on the gable end wall/lead chase.

 

IMG-20160314-WA0027IMG-20160315-WA0000IMG-20160315-WA0001IMG-20160315-WA0002IMG-20160315-WA0003IMG-20160315-WA0004IMG-20160315-WA0005IMG-20160315-WA0006IMG-20160315-WA0007IMG-20160315-WA0008

 

Stripping off the concrete tiles & rotten lath battens to install new breathable membrane pitched roof underlay all the way up the verge from the gutter line to the ridge line & over the apex followed by installation of new tanalised lath battens, drip trays & re-bedding/pointing the tiles at the verge.

 

IMG-20160314-WA0000IMG-20160314-WA0001IMG-20160314-WA0002IMG-20160314-WA0003IMG-20160314-WA0004IMG-20160314-WA0005IMG-20160314-WA0006IMG-20160314-WA0007IMG-20160314-WA0008IMG-20160314-WA0009IMG-20160314-WA0010IMG-20160314-WA0011IMG-20160314-WA0012IMG-20160314-WA0014IMG-20160314-WA0016IMG-20160314-WA0016aIMG-20160314-WA0017IMG-20160314-WA0017aIMG-20160314-WA0018IMG-20160314-WA0020IMG-20160314-WA0021IMG-20160314-WA0021aIMG-20160314-WA0022IMG-20160314-WA0024IMG-20160314-WA0026IMG-20160314-WA0027

Leave a Reply