Raking out & re-pointing of failed mortar & replacement of missing/broken slates
Raking out & re-pointing of failed mortar & replacement of missing/broken slates
Installation of Classic Bond one piece EPDM rubber membrane onto new extension flat roof including trims
Strip & re-cover of pitched tiled roof featuring installation of new: 50mm Celotex insulation board, breathable membrane underlay, eaves felt support trays, lath battens, Sandtoft Calderdale tiles, Sandtoft dry verge cover system & Sandtoft dry ridge system plus replacement of rotten spar timbers
Installation of new Sandtoft Calderdale tiles.
Rotten spar timbers which need replacing.
Installation of new roof.
Strip & re-cover of tiled roof. Installation of new 50mm insulation, breathable membrane underlay, eaves felt support trays, lath battens & Sandtoft Calderdale tiles
Re-fixing of lead flashings, clearance of gulley behind chimney stack & general roof inspection
Installation of white GRP top coat. This top coat in white has high UV reflective qualities which gives it a longer lifespan & keeps the building cooler in hot sunny weather
Laying the fibreglass chopped strand reinforcement mat.
Removal of chippings followed by priming of the bitumen deck