Platnam Grove, Birkby

Platnam Grove, Birkby

When this property was built the dry verge covers were secured with ordinary nails which has caused them to work themselves loose in the wind. Some were not even nailed. As per the manufacturer’s instructions we have taken them all off & re-secured them using 60mm twin thread galvanised screws

20140801_131016_resized 20140801_131024_resized 20140801_142128 20140801_142220 20140801_142229 20140801_142233 20140801_142836 20140801_143256 20140801_143310 20140801_143425 20140801_144757 20140801_144759 20140801_144805 20140801_145026 20140801_145034 20140801_145643 20140801_145726 20140801_145734 20140801_145823 20140801_151754 20140801_151758 20140801_152630 20140801_152634 20140801_154906 20140801_154916 20140801_155046 20140801_155243 20140801_155406 20140801_155925 20140801_160002 20140801_160018 20140801_160023 20140801_160635 20140801_160720 20140801_160731

Church Street, Moldgreen

Church Street, Moldgreen

Installation of GRP top coat containing U.V. reflective protection.

20140728_153508 20140728_153512 20140728_154932 20140728_154937 20140728_160122 20140728_160129 20140728_160134 20140728_160648 20140728_160812 20140728_162259

Installation of new Sterling OSB board, GRP drip edge trims & new GRP deck.

20140724_120316 20140724_120615 20140724_120707 20140724_120759 20140724_121002 20140724_133812 20140724_133837 20140724_140732 20140724_141241 20140724_141321 20140724_141345 20140724_144806 20140724_144813 20140724_150400 20140724_152109 20140724_152128 20140724_152613 20140724_153203 20140724_153207 20140724_153213 20140724_153224 20140724_153248

Preparing the deck by removing the old failed green mineral to get a more even surface

20140723_145004 20140723_145012 20140723_145023 20140723_145026 20140723_145316 20140723_150529 20140723_150538

Deer Croft Crescent, Salendine Nook

Deer Croft Crescent, Salendine Nook

Roof overhaul. Repairs to under felt using breathable membrane underlay, lifting & re-bedding ridge & hip tiles. Replacing broken/damaged roof tiles. Installation of new UPVC cladding, fascia & trims to cheek & face of dormer. Sealing failed bitumen flat dormer roof deck using GRP. Chimney stack rendering.

When this roof was installed the under felt at the back of the dormer was installed behind the top lead flashings at the cheeks causing water ingress. It was also installed over the bottom lath batten creating a natural pooling area for the rain water, the white tide marks can clearly be seen in the photos. Consequently the under felt has aged quickly & failed

20140723_12391720140723_12392520140723_15373220140723_15414520140723_15462020140610_16081520140610_16083220140610_16085220140610_16085620140610_16090120140610_16094020140610_16094420140610_17392220140610_17395920140610_17400320140610_17400920140610_17401720140603_16595720140603_13412620140603_13415020140603_15280420140603_15311720140603_17022120140530_13291020140530_13295220140530_132959

20140530_13300620140530_13301320140530_13302020140530_165614 20140530_16563920140530_16565220140530_16565920140530_16570320140527_131434

20140527_131438

20140527_131455

20140527_131506

20140527_131512

20140527_142444

20140527_143343

20140527_143542

20140527_143556

20140527_145238

20140527_145246

20140329_14434620140329_144353 20140329_144402 20140329_144411 20140329_144415 20140329_144426 20140329_144432 20140329_144455 20140329_144459 20140329_144509 20140329_144526 20140329_144545 20140521_114022 20140521_114029 20140521_114035 20140521_114046 20140521_114052 20140521_114102 20140521_133819 20140521_133823 20140521_133829 20140521_134025 20140521_134033 20140521_134337 20140521_134343 20140521_135749 20140521_135843 20140521_135852 20140521_141317 20140521_141349 20140521_141422 20140521_141426 20140521_151305 20140521_151308 20140521_151316 20140521_151357 20140521_154411 20140521_154413 20140521_154416 20140521_155944 20140521_160000 20140521_160709 20140521_160722 20140521_160725 20140521_162724 20140521_162733 20140521_162741 20140521_162749 20140521_162808