Strip and re-cover of pitched slate roof using new eaves guard trays, Proctor’s Roofshield vapour permeable breathable membrane pitched roof underlay and tanalised lath battens
Strip and re-cover of pitched slate roof using new eaves guard trays, Proctor’s Roofshield vapour permeable breathable membrane pitched roof underlay and tanalised lath battens
Stripping off the existing concrete roof tiles, lath battens and lead sheeting on the valley gutter to install new section of vapour permeable breathable membrane pitched roof underlay to prevent further water ingress plus Re-pointing the failed mortar at the verges
Raking out and Re-pointing the failed mortar in the bonds between the stone blocks and the chimney stack flaunch
Repairs to the bitumen under felt around the chimney stack using new vapour permeable breathable membrane pitched roof underlay
Replacing the wooden gutters and old downpipe
Strip and re-cover of pitched slate roof using new eaves guard trays, Proctor’s Roofshield vapour permeable breathable membrane pitched roof underlay and tanalised lath battens plus new insulation. Raking out and Re-pointing the failed mortar in the bonds between the stone blocks on the chimney stack and gable end
Strip and re-cover of pitched slate roof using new eaves guard trays, Proctor’s Roofshield vapour permeable breathable membrane pitched roof underlay and tanalised lath battens plus new insulation
Raking out and Re-pointing the failed mortar in the bonds between the stone blocks on the chimney stacks and on the flaunches
Stripping off the concrete roof tiles and lead sheets on the valley gutter to carry out repairs to the wrongly installed under felt using Proctor’s Roofshield vapour permeable breathable membrane pitched roof underlay
Strip and re-cover of pitched roof using new eaves guard trays, Proctors Roofshield vapour permeable breathable membrane pitched roof underlay, tanalised lath battens, GRP (Glassfibre Reinforced Polyester) dry fix valley gutters, GRP dry fix bonding gutters over the party wall, interlocking concrete roof tiles, angled concrete ridge tiles mechanically secured using dry fix ridge system and UPVC interlocking dry verge covers system
Removing the ridge tiles and failed mortar to install new half round concrete ridge tiles mechanically secured using dry fix ridge system plus repairs to the under felt around the flue pipe
Repairs to the wrongly installed under felt using Proctor’s Roofshield vapour permeable breathable membrane pitched roof underlay
Lifting the water table coping stones on the verge to carry out repairs to the under felt
Installation of new glassfibre chopped strand mat embedded in polyurethane plus installation of new skylight
Preparing and priming the flat roof deck