New flat roof outlet guard to prevent further internal downpipe blockages
Clearing the blocked flat roof outlet to restore the flow and prevent further rainwater ingress
New flat roof outlet guard to prevent further internal downpipe blockages
Clearing the blocked flat roof outlet to restore the flow and prevent further rainwater ingress
Stripping off the damaged and broken slates to replace them and re-bedding & pointing the ridge tiles
Stripping off the slates and lath battens to install new vapour permeable breathable membrane pitched roof underlay, lead flashings and eaves guard trays plus replacing the broken slates
Lifting the ridge tiles, removing the failed mortar and mechanically re-securing them using dry fix ridge system
Installation of new vapour permeable breathable membrane pitched roof underlay on the verge
New white UPVC cladding on the cheek of the dormer
Installation of new vapour permeable breathable membrane pitched roof underlay and tanalised lath battens on the dormer face and cheek
Gutter clearance
Removing the gutter stop ends to restore the flow and new Classic Bond EPDM rubber cap sheet with white UPVC trims on the bay window flat roof
Gutter and gulley clearance, replacing the broken roof tiles and roof inspection
Strip and re-cover of pitched roof using new eaves guard trays, Proctor’s Roofshield vapour permeable breathable membrane pitched roof underlay, tanalised lath battens, GRP (Glassfibre Reinforced Polyester) valley gutters, Breedon interlocking concrete roof tiles, Lagan angled concrete ridge tiles mechanically secured using dry ridge fixing system and UPVC interlocking dry verge covers system