Raking out and re-pointing the failed mortar on the ridge tiles
Raking out and re-pointing the failed mortar on the ridge tiles and coping stones, gutter clearance and slate repairs
Installation of new Classic Bond EPDM rubber cap sheet plus lifting and re-bedding the coping stones at the verge
Strip and re-cover of pitched bay window roof using new eaves guards, Proctor’s Roofshield vapour permeable breathable membrane pitched roof underlay and tanalised lath battens plus new downpipes
New Classic Bond EPDM rubber cap sheet and white UPVC trims at the drip edges
Re-pointing the ridge tiles and verges
Raking out the failed mortar
Installation of new Classic Bond EPDM rubber cap sheet
Installation of new Sterling OSB roof boards, timber upstands, rockwool insulation, Classic Bond EPDM rubber cap sheet, anti corrosion / U.V. textured aluminium flashings at the abutment wall, white UPVC fascia trims at the verges / drip edge and black UPVC half round guttering
Stripping off the failed bitumen cap sheet and rotten roof boards
Stripping off the concrete roof tiles, lead and slates to carry out repairs to the perished bitumen under felt / wrongly install EPDM rubber cap sheet using vapour permeable breathable membrane pitched roof underlay and re-pointing the failed mortar on the water table coping stones at the verge
Installation of new under felt adjacent to the dormer cheek where none was present and re-pointing the failed mortar on the gable end wall
Carrying out repairs to the bitumen under felt over the kick board and installation of new Firestone EPDM rubber cap sheet on the flat dormer roof plus white UPVC trims
Lifting, re-bedding and pointing the ridge tiles using new mortar
Removing the redundant air vent pipe
Strip and re-cover of pitched roof using new eaves guards, Proctors Roofshield vapour permeable breathable membrane pitched roof underlay, GRP (Glassfibre Reinforced Polyester) dry bonding gutters, tanalised lath battens and Sandtoft Calderdale concrete roof tiles plus rendering the chimney stack and re-pointing the failed mortar on the flaunch.