Moorside Road, Honley

Moorside Road, Honley

Installation of new black ash UPVC trims fixed using ring shanked galvanised steel polytop nails

Installation of new Classic Bond EPDM rubber cap sheet onto the new Sterling OSB roof boards

Installation of new timber firrings to give the roof deck suitable flow and Sterling OSB roof boards on flat garage roof

Heaton Road, Paddock

Heaton Road, Paddock

Replacing the dilapidated sections of lead on the valley gutter using new code 4 milled lead, re-fixing the slates replacing any that were damaged or broken and re-bedding and pointing the ridge tiles using new mortar

Stripping off the slates, lath battens and lead on the valley gutter to install new vapour permeable breathable membrane pitched roof underlay and tanalised lath battens

Coniston Avenue, Dalton

Coniston Avenue, Dalton

Stripping off the concrete roof tiles and lath battens to carry out repairs to the perished bitumen under felt at the eaves using vapour permeable breathable membrane pitched roof underlay plus new white UPVC trims on the bay window / porch flat roof

Re-pointing the failed mortar on the hip and ridge tiles using new mortar

Installation of new Sterling OSB roof boards, Classic Bond EPDM rubber cap sheet and white UPVC trims fixed using ring shanked galvanised steel polytop nails

Longfield Avenue, Northowram

Longfield Avenue, Northowram

Update:

Re-bedding and pointing the ridge and hip tiles using new mortar

Stripping off the concrete roof tiles, lath battens, lead on the valley gutter and perished bitumen under felt to install new vapour permeable breathable membrane pitched roof underlay and tanalised lath battens

Stripping off the hip tiles

Cadogan Avenue, Lindley

Cadogan Avenue, Lindley

Carrying out repairs to the slates and lead soakers, installation of new anti corrosion/U.V. coated aluminium flashings at the abutment walls plus removing the failed render and re-rendering the abutment walls

Bradley Road, Bradley

Bradley Road, Bradley

Installation of new angled concrete ridge tiles mechanically secured using dry ridge fixing system plus new code 4 milled lead on the valley gutter

Stripping off the concrete roof tiles and lath battens to install new boards and vapour permeable breathable membrane pitched roof underlay on the valley gutter