Re-fixing the downpipes
New concrete roof tiles and ridges re-bedded and pointed
Stripping off the slates, lath battens and monofoil under felt to install new vapour permeable breathable membrane pitched roof underlay, tanalised lath battens and concrete roof tiles plus lining the gulley using Classic Bond EPDM rubber cap sheet
Raking out and re-pointing the failed mortar on the ridge tiles using new mortar plus replacing the missing render on the chimney stack
Installation of new Classic Bond EPDM rubber cap sheet and white UPVC trims on the flat dormer roof
Installation of new white UPVC cladding on the cheeks and face of the dormer plus removing the redundant chimney pots and capping the stack off with a new flaunch
New ridge tiles bedded and pointed plus sealing the lead gulley using Classic Bond EPDM rubber cap sheet
Repairs to the wrongly installed under felt using vapour permeable breathable membrane pitched roof underlay and tanalised lath battens plus lifting, re-bedding and pointing the ridge and hip tiles using new mortar
Repairs to the perished bitumen under felt at the eaves using vapour permeable breathable membrane pitched roof underlay and eaves felt support trays
Preparing the deck, cutting new chase for the flashings and installing new Classic Bond EPDM rubber cap sheet
Repairs to the leaking pitched roof area
Sealing the leaking cast iron trough gutter joints, repairs to the lead flashings and skylights
Repairs to the leaking flue pipe flashing and cast iron trough gutter joints
Preparing and sealing the leaking cast iron trough gutter joints
Cast iron trough gutter clearance
Repairs to the slates plus lifting, re-bedding and pointing the ridge tiles using new mortar replacing any that were damaged or broken