Strip & re-cover of concrete tiled roof using new eaves felt support trays, vapour permeable breathable membrane pitched roof underlay & tanalised lath battens.
Strip & re-cover of concrete tiled roof using new eaves felt support trays, vapour permeable breathable membrane pitched roof underlay & tanalised lath battens.
Re-pointing of failed mortar on the water table coping stones at the verge & chimney stack flaunch and slate repairs.
Lead gulley clearance & new wire mesh outlet guard to prevent further blockages causing rain water ingress. Roof overhaul & maintenance. Re-pointing of coping stones using lime mortar.
Lime mortar rendering on the chimney stack
Chimney stack re-rendered & flaunch re-pointed, slates repaired, water table coping stones on the verge re-pointed & vegetation removed and ridge tiles re-pointed.
Preparing the chimney stack for rendering.
Installation of new black UPVC square line guttering, repairs to the perished bitumen under felt using breathable membrane pitched roof underlay and re-rendering the chimney stack.
Installation of new aluminium/rubber pipe flashing slate on pitched roof.
Removal of redundant chimney stack which has been causing damp inside the property.
Replacement of the dilapidated lead on the valleys using new code 4 milled lead.
Replacement of rotten timbers.
Stripping of the failed green mineral cap sheet and installation of new Classic Bond EPDM rubber cap sheet. Classic Bond EPDM rubber has a 20 year manufacturer’s backed guarantee.