Leeds Road, Huddersfield

Leeds Road, Huddersfield

Re-bedding & pointing the ridge tiles which had been lifted to take the new breathable membrane over the apex of the roof.

 

IMG-20160317-WA0000IMG-20160317-WA0001IMG-20160317-WA0002

 

Stripping off the concrete tiles, ridge tiles & lath battens to carry out repairs to the collapsing perished bitumen under felt using breathable membrane pitched roof underlay. This was installed under the bonding gutter over the party wall which has damp & mould all the way up it inside the property.

 

IMG-20160316-WA0001IMG-20160316-WA0002IMG-20160316-WA0003IMG-20160316-WA0004IMG-20160316-WA0005IMG-20160316-WA0006IMG-20160316-WA0007IMG-20160316-WA0008IMG-20160316-WA0009IMG-20160316-WA0010IMG-20160316-WA0011IMG-20160316-WA0012IMG-20160316-WA0013IMG-20160316-WA0014IMG-20160316-WA0015IMG-20160316-WA0016IMG-20160316-WA0017IMG-20160316-WA0018IMG-20160316-WA0019IMG-20160316-WA0020

Longwood Road, Paddock

Longwood Road, Paddock

Rendering the remainder of the lowered chimney stack & sealing the gap between the back of the cast iron gutter and the tiles which has been causing damp inside the property.

 

20160315_10052020160315_10055920160315_10061020160315_11032620160315_11033120160315_11033820160315_11034420160315_11462220160315_114949

 

Installation of new chimney stack flaunch & cowls.

 

IMG-20160224-WA0000IMG-20160224-WA0000aIMG-20160224-WA0005IMG-20160224-WA005aIMG-20160224-WA0006IMG-20160224-WA0007IMG-20160224-WA0008IMG-20160224-WA0010aIMG-20160224-WA0010bIMG-20160224-WA0010cIMG-20160224-WA0012aIMG-20160224-WA0012bIMG-20160224-WA0012cIMG-20160224-WA0013

 

Lowering the redundant chimney stack which has been causing damp inside the property.

 

IMG-20160223-WA0000IMG-20160223-WA0001IMG-20160223-WA0002IMG-20160223-WA0003IMG-20160223-WA0004IMG-20160223-WA0005IMG-20160223-WA0006IMG-20160223-WA0007IMG-20160223-WA0008IMG-20160223-WA0009IMG-20160223-WA0010IMG-20160223-WA0011IMG-20160223-WA0012IMG-20160223-WA0013IMG-20160223-WA0014IMG-20160223-WA0015IMG-20160223-WA0016IMG-20160223-WA0017IMG-20160223-WA0018IMG-20160223-WA0019IMG-20160223-WA0020IMG-20160223-WA0021

Crosland Road, Oakes

Crosland Road, Oakes

Re-bedding & pointing the ridge tiles and re-pointing the failed mortar on the gable end wall/lead chase.

 

IMG-20160314-WA0027IMG-20160315-WA0000IMG-20160315-WA0001IMG-20160315-WA0002IMG-20160315-WA0003IMG-20160315-WA0004IMG-20160315-WA0005IMG-20160315-WA0006IMG-20160315-WA0007IMG-20160315-WA0008

 

Stripping off the concrete tiles & rotten lath battens to install new breathable membrane pitched roof underlay all the way up the verge from the gutter line to the ridge line & over the apex followed by installation of new tanalised lath battens, drip trays & re-bedding/pointing the tiles at the verge.

 

IMG-20160314-WA0000IMG-20160314-WA0001IMG-20160314-WA0002IMG-20160314-WA0003IMG-20160314-WA0004IMG-20160314-WA0005IMG-20160314-WA0006IMG-20160314-WA0007IMG-20160314-WA0008IMG-20160314-WA0009IMG-20160314-WA0010IMG-20160314-WA0011IMG-20160314-WA0012IMG-20160314-WA0014IMG-20160314-WA0016IMG-20160314-WA0016aIMG-20160314-WA0017IMG-20160314-WA0017aIMG-20160314-WA0018IMG-20160314-WA0020IMG-20160314-WA0021IMG-20160314-WA0021aIMG-20160314-WA0022IMG-20160314-WA0024IMG-20160314-WA0026IMG-20160314-WA0027

Cowlersley Pharmacy, Cowlersley

Cowlersley Pharmacy, Cowlersley

Installation of new lead apron at the abutment & sealing the chase.

 

IMG-20160309-WA0000IMG-20160309-WA0001IMG-20160310-WA0011IMG-20160310-WA0012IMG-20160310-WA0013IMG-20160310-WA0014IMG-20160310-WA0015IMG-20160310-WA0016IMG-20160310-WA0018IMG-20160310-WA0019IMG-20160310-WA0020IMG-20160310-WA0021IMG-20160310-WA0022IMG-20160310-WA0023IMG-20160310-WA0024IMG-20160310-WA0025IMG-20160310-WA0026IMG-20160310-WA0027IMG-20160310-WA0028IMG-20160310-WA0029IMG-20160310-WA0030IMG-20160310-WA0030aIMG-20160310-WA0031IMG-20160310-WA0032IMG-20160310-WA0033IMG-20160310-WA0034IMG-20160310-WA0035IMG-20160310-WA0036IMG-20160310-WA0043

 

Stripping off the concrete tiles & lath battens followed by installation of breathable membrane pitched roof underlay at the abutment. When the original roof was installed the under felt was left too short at the top of the roof where it meets the wall at the abutment.

 

20160205_11550820160205_11551220160205_115517IMG-20160308-WA0000IMG-20160308-WA0000aIMG-20160308-WA0001IMG-20160308-WA0002IMG-20160308-WA0003IMG-20160308-WA0008IMG-20160308-WA0009IMG-20160308-WA0014IMG-20160308-WA0015IMG-20160308-WA0018IMG-20160308-WA0019IMG-20160308-WA0021IMG-20160308-WA0022IMG-20160308-WA0023IMG-20160308-WA0024IMG-20160308-WA0025IMG-20160308-WA0028IMG-20160308-WA0029IMG-20160308-WA0029aIMG-20160308-WA0030IMG-20160308-WA0031IMG-20160308-WA0031aIMG-20160308-WA0033IMG-20160308-WA0034IMG-20160308-WA0035IMG-20160308-WA0035aIMG-20160308-WA0036IMG-20160308-WA0037

Adelphi Road, Marsh

Adelphi Road, Marsh

Installation of drip trays, painting the fascia & sealing the air vents to the slates.

 

IMG-20160307-WA0023IMG-20160307-WA0024IMG-20160307-WA0030IMG-20160307-WA0032IMG-20160307-WA0033IMG-20160307-WA0037IMG-20160307-WA0040IMG-20160307-WA0042IMG-20160307-WA0043IMG-20160307-WA0044IMG-20160307-WA0045IMG-20160310_103557IMG-20160310_105344IMG-20160310_105331IMG-20160310_111837IMG-20160310_111852IMG-20160310_111858IMG-20160310_112426IMG-20160310_112456IMG-20160310-WA0041IMG-20160310-WA0042IMG-20160310-WA0044IMG-20160310-WA0045

 

Re-pointing the failed mortar on the ridge tiles, sealing the soil pipe to the slates and installation of drip trays at the gutter line.

 

001IMG-20160307-WA0000aIMG-20160307-WA0000aa IMG-20160307-WA0000aaaIMG-20160307-WA0000bIMG-20160307-WA0000cIMG-20160307-WA0000dIMG-20160307-WA0000eIMG-20160307-WA0001IMG-20160307-WA0002IMG-20160307-WA0003IMG-20160307-WA0004IMG-20160307-WA0004aIMG-20160307-WA0008IMG-20160307-WA0010IMG-20160307-WA0011IMG-20160307-WA0013IMG-20160307-WA0013aIMG-20160307-WA0014IMG-20160307-WA0014aIMG-20160307-WA0015IMG-20160307-WA0015aIMG-20160307-WA0017IMG-20160307-WA0018IMG-20160307-WA0019IMG-20160307-WA0020IMG-20160307-WA0021aIMG-20160307-WA0022IMG-20160307-WA0022aIMG-20160307-WA0022b

Ukranian Club, Edgerton

Ukranian Club, Edgerton

Sealing the lead gulley.

 

20160310_15552920160310_161147

 

Re-pointing the failed mortar.

 

IMG-20160307-WA0054IMG-20160307-WA0055IMG-20160307-WA0055aIMG-20160307-WA0057IMG-20160307-WA0056IMG-20160307-WA0059IMG-20160307-WA0060IMG-20160307-WA0061IMG-20160307-WA0063IMG-20160307-WA0065IMG-20160307-WA0066IMG-20160307-WA0069IMG-20160307-WA0070IMG-20160307-WA0071IMG-20160307-WA0072IMG-20160307-WA0073

 

Installation of cast iron guttering with new outlet, new downpipes & preparing the external wall for pointing.

 

IMG-20160302-WA0017IMG-20160302-WA0018IMG-20160302-WA0019IMG-20160302-WA0020IMG-20160302-WA0021IMG-20160302-WA0022IMG-20160302-WA0023IMG-20160302-WA0024IMG-20160302-WA0025IMG-20160302-WA0026IMG-20160302-WA0027IMG-20160302-WA0028IMG-20160302-WA0029IMG-20160302-WA0030IMG-20160302-WA0031IMG-20160302-WA0032IMG-20160302-WA0033IMG-20160302-WA0034IMG-20160302-WA0035IMG-20160302-WA0036IMG-20160302-WA0037IMG-20160302-WA0038IMG-20160302-WA0039

 

Scaffold & boarding erected to rake out & re-point the failed mortar and carry out other maintenance.

 

IMG-20160301-WA0001IMG-20160301-WA0002IMG-20160301-WA0003IMG-20160301-WA0004IMG-20160301-WA0005IMG-20160301-WA0006IMG-20160301-WA0007IMG-20160301-WA0008IMG-20160301-WA0009IMG-20160301-WA0010IMG-20160301-WA0011IMG-20160301-WA0012IMG-20160301-WA0013IMG-20160301-WA0014IMG-20160301-WA0015IMG-20160301-WA0016IMG-20160301-WA0017IMG-20160301-WA0018IMG-20160301-WA0019

Knightsbridge Furniture, Bradford

Knightsbridge Furniture, Bradford

Clearing all the debris off the flat roof. Raking out & re-pointing the chase on the ashfelt upstands.

 

IMG-20160310-WA0006IMG-20160310-WA0000IMG-20160310-WA0001IMG-20160310-WA0002IMG-20160310-WA0003IMG-20160310-WA0004IMG-20160310-WA0005IMG-20160310-WA0007IMG-20160310-WA000820160308_11463520160308_11464320160308_11464920160308_11541120160308_11541620160308_11542720160308_12035920160308_12040420160308_12070120160308_12322720160308_12324020160308_14184120160308_14184720160308_14185220160308_14221220160308_14222120160308_14340420160308_14341020160308_143424
Flat roof inspection and clearance. Cast iron trough gutter clearance and repairs.

 

20160307_12150020160307_12153820160307_12155320160307_12160320160307_12161520160307_12162420160307_12163320160307_12165620160307_13354520160307_13584020160307_13584820160307_13585320160307_13591820160307-WA004320160307-WA004420160307-WA0044a20160307-WA0044b20160307-WA004520160307-WA0049

 

Re-rendering the failed areas of old render, sealing the cast iron tough gutter, installation of new stop end, repairs to Trafford sheets & the lead flashings on the lead gulley.

 

20160303_13160820160303_13161120160303_13162320160303_13435620160303_13440120160303_13440720160303_13443120160303_13445320160303_13530520160303_14024220160303_14065420160303_14071320160303_14080020160303_14083020160303_14100020160303_14110020160303_14120020160303_14130020160303_14140020160303_14160020160303_14355320160303_14542320160303_145427

 

Clearing the cast iron trough gutter in preparation for re-lining & repairs to leaking window cill & frame.

 

20160223_13580520160223_13582520160223_13584620160223_13584920160223_13590020160301_000620160301_09234520160302_09240020160302_09250020160302_09260020160302_09270020160302_09280020160302_09290020160302_09300020160302_14411320160302_14412420160302_14412520160302_14412620160302_14413120160302_14413920160302_14414720160302_14415920160302_14421020160302_14432020160302_14553020160302_14553920160302_14554620160302_15162620160302_15164920160302_15171020160302_15172120160302_15173420160302_15174120160302_15174420160302_151753<20160302_152000