Stripping out the concrete tiles to carry out repairs to holes in the bitumen under felt. Replacing & re-fixing the lead flashings & re-pointing the chase. Raking out & re-pointing of failed mortar on chimney stack. Rendering the rear side of the chimney stack & clearing the lead gulley. Installation of a new flaunch (cap) on the chimney stack.

 

20151119_111920_resized 20151119_111921_resized 20151119_111924_resized 20151119_111930_resized 20151119_112002_resized 20151119_112007_resized 20151119_112021_resized 20151119_112023_resized 20151119_112027_resized 20151119_112030_resized 20151119_112117_resized 20151119_112402_resized 20151119_112931_resized 20151119_112934_resized 20151119_113438_resized 20151119_113635_resized 20151119-WA0000 20151119-WA0003 20151119-WA0004 20151119-WA0006 20151119-WA000820151119-WA0007 20151119-WA0009

Leave a Reply