Lifting & re-bedding stone ridge tiles using lime mortar.
Blocked outlet clearance to restore the flow. When this property was built the outlet in the lead gulley was too small. At the size of a 50 pence piece it easily gets blocked and causes water ingress into the property. We will make it wider to prevent blockages in the future with the correct maintenance plan (i.e. clearing the gulley every autumn).
Harness lanyard anchor point installation and sealing leaking stitch bolt heads, steel clad sheet laps & ridge line.
Repairs to steel clad sheets, stitch bolt heads & skylights.
Repairs to leaking trough gutter joints, steel clad parapet joints and outlets using GRP and gutter clearance.
Trough gutter clearance.
Replacement of missing slates & raking out and re-pointing the water table coping stones at the verge.
Repairs to trough gutter joints, gutter clearance & Trafford sheet repairs.
Trough gutter clearance.
Repairs to leaking skylight frames & glass panes.
Repairs to dilapidated bitumen under felt using breathable membrane pitched roof underlay, rotten lath batten replacement using new treated lath battens, new drip trays, new guttering, rendering of abutment wall, new ply board installation & re-pointing of water table coping stones plus skylight repairs using EPDM.
Blocked outlet clearance.
Replacement of lead on gulley. When this roof was installed the lead on the gulley was only 450mm wide which left it short under the felt & tiles causing water ingress. we have replaced it using new code 4 lead 600mm wide to solve the problem.