Strip & re-cover of concrete tiled roof using new eaves felt support trays, vapour permeable breathable membrane pitched roof underlay & tanalised lath battens.
Strip & re-cover of concrete tiled roof using new eaves felt support trays, vapour permeable breathable membrane pitched roof underlay & tanalised lath battens.
Re-pointing of failed mortar on the water table coping stones at the verge & chimney stack flaunch and slate repairs.
Lead gulley clearance & new wire mesh outlet guard to prevent further blockages causing rain water ingress. Roof overhaul & maintenance. Re-pointing of coping stones using lime mortar.
Lime mortar rendering on the chimney stack
Chimney stack re-rendered & flaunch re-pointed, slates repaired, water table coping stones on the verge re-pointed & vegetation removed and ridge tiles re-pointed.
Preparing the chimney stack for rendering.
Installation of new black UPVC square line guttering, repairs to the perished bitumen under felt using breathable membrane pitched roof underlay and re-rendering the chimney stack.
Removal of redundant chimney stack which has been causing damp inside the property.
Replacement of the dilapidated lead on the valleys using new code 4 milled lead.
Replacement of rotten timbers.
Stripping of the failed green mineral cap sheet and installation of new Classic Bond EPDM rubber cap sheet. Classic Bond EPDM rubber has a 20 year manufacturer’s backed guarantee.