Preparing & sealing the lead flashings, re-pointing the failed mortar on the water table coping stones, re-bedding & pointing the chimney stack coping stones plus re-rendering the failed render on the chimney stack.
Preparing & sealing the lead flashings, re-pointing the failed mortar on the water table coping stones, re-bedding & pointing the chimney stack coping stones plus re-rendering the failed render on the chimney stack.
Stripping off the concrete tiles & rotten lath batten to carry out repairs to the damaged bitumen under felt adjacent to the lead valley using breathable membrane pitched roof underlay. When this property was constructed the lath battens were cut slightly too short at the side of the valley and did not rest on the valley board. Consequently over time the weight of the concrete tiles has slowly pushed the ends of the lath battens down through the bitumen under felt which in turn has caused water ingress into the property.
Installation of new gas cowl at the ridge line. Bedding & pointing the new ridge tiles.
Removing the remainder of the chimney stack & closing off the gap left behind using new tanalised lath battens & reclaimed Rosemary clay tiles.
Removing the redundant chimney stack which has been causing extreme damp inside the property.
Strip & re-cover of flat roof using Classic Bond EPDM rubber cap sheet.
Repair to stone step.
Installation of flat roof trims and re-pointing the failed mortar on the ridge tiles.
Closing off the cavity left behind after removing the redundant chimney stack using new tanalised lath battens and tiles plus installation of new flat roof deck using Sterling OSB roof board & EPDM rubber cap sheet.
Removing the redundant chimney stack
Re-pointing the failed mortar on the chimney stack flaunches, re-dressing the lead flashings & replacement of broken tiles.
New Mortar
Replacement of missing or broken hip/roof tiles plus lifting, re-bedding & pointing of the hip & ridge tiles using new mortar.
Gutters Cleared
Repair Work
Preparing and rendering the chimney stack plus sealing the lap on the flat roof green mineral cap sheet.
Re-bedding & pointing the ridge tiles which had been lifted to take the new breathable membrane over the apex of the roof.
Stripping off the concrete tiles, ridge tiles & lath battens to carry out repairs to the collapsing perished bitumen under felt using breathable membrane pitched roof underlay. This was installed under the bonding gutter over the party wall which has damp & mould all the way up it inside the property.
Rendering the remainder of the lowered chimney stack & sealing the gap between the back of the cast iron gutter and the tiles which has been causing damp inside the property.
Installation of new chimney stack flaunch & cowls.
Lowering the redundant chimney stack which has been causing damp inside the property.