Gutter clearance
Re-pointing and sealing the lead valley gutter plus replacement dry verge covers
Stripping off the lead flashings, concrete roof tiles and lath battens to install new breathable membrane pitched roof underlay at the abutment wall where the under felt was cut too short when the property was constructed causing water ingress
Flat roof conversion completed with new Classic Bond EPDM rubber cap sheet, GRP flashings and white UPVC trims/fascia
Installation of new insulation boards and Classic Bond EPDM rubber cap sheet
Stripping off the concrete roof tiles to install new Sterling OSB roof boards
Re-building and pointing the stone blocks, string course and dentils at the top of the exterior wall followed by installation of newly refurbished cast iron guttering
Removal of dilapidated cast iron guttering
Slate repairs
Slate and lead repairs
Raking out and re-pointing the failed mortar on the chimney stacks and slate/lead repairs
Refurbishment of cast iron guttering
Replacing the rotten timbers at the verges
Update; Ridge tiles re-bedded using new mortar and lead valleys sealed
Stripping off the slates to replace the rotten lath battens
Stripping off the concrete roof tiles, lath battens and perished bitumen under felt at the eaves to install new vapour permeable breathable membrane pitched roof underlay and eaves felt support trays, plus new black UPVC square line guttering.