Sealing the ashfelt gulley using GRP, sealing the bonds between the coping stones using polyurethane, rubbish clearance to access the flat roof below the steel flooring and unblocking the outlet to restore the flow.

 

20151124_135138 20151124_135141 20151124_135424 20151124_135433 20151127_113307 20151127_113326 20151127_115318 20151127_115844 20151127_115850 20151127_115900 20151127_123607 20151127_123628 20151127_123639 20151127_123929 20151127_130904 20151127_131035 20151127_131750 20151127_131837

Leave a Reply